The SMP Review has been undertaken by consultants Royal Haskoning
Draft SMP2
Strategic Environmental Assessment (SEA)
The final Strategic Environmental Assessment (SEA) report is now available for review - please visit the SEA page for information and downloads.
5th August 2010
SMP2 version 2 - June 2010
Following public consultation and consideration by the Environment Agency's National Quality Review Group, a revised draft has been published (SMP2 version 2) which shows all the changes made since SMP2 version 1.
This version has been adopted by Bournemouth Borough Council and is available to download from www.bournemouth.gov.uk.
Once approved by all five local authorities the final document will be published here.
25th June 2010
COMMENTS from the Environment Agency's National Quality Review Group, including responses from the project team:
Review of the SMP2 document (Excel spreadsheet, 200kb)
Quality and Presentation comments (Excel spreadsheet, 62kb)
2nd May 2010
COMMENTS & DECISIONS following the public consultation that ended 17th February.
Download the Excel spreadsheet (400kb file size) to read all 119 comments and the response to each.
Please note that your comments have been organised by PDZ, with each under a different tab at the bottom of the document. Decisions are colour-coded:
Change/action required to the SMP Document
No change required to the SMP Document
To be included within the Action Plan of the SMP
To be taken forward to the Strategy Study
Many thanks to all those that took the time & trouble to respond to the Draft SMP2.
31st March 2010
SMP2 version 1 - November 2009
The original Draft SMP (November 2009, prior to changes required as a result of the consultation) can be downloaded in manageable sections from the links below:
All documents open in a new window
File Size
Section 1
Introduction
2.6 MB
Section 2
Environmental Assessment
0.8 MB
Section 3
Basis for Development of the Plan
3.4 MB
Section 4
Appraisal of Options and Rationale for Preferred Plan:
Section 4.1
8.5 MB
Section 4.2
Policy Development Zone 1 Central and Eastern Sections of Christchurch Bay (Hurst Spit to Friars Cliff)
15.6 MB
Section 4.3
Policy Development Zone 2 Christchurch Harbour and Central Poole Bay (Friars Cliff to Flag Head Chine)
16.3 MB
Section 4.4
Policy Development Zone 3 Poole Harbour and Associated Coastline (Flag Head Chine to Handfast Point, including Poole Harbour)
19.8 MB
Section 4.5
Policy Development Zone 4 Swanage (Handfast Point to Durlston Head)
8.7 MB
Section 5
Summary of Preferred Plan and Implications
0.4 MB
Section 6
Policy Summary, including
Policy Summary Map (opens in a new window - please note)
5.3 MB
Appendices
Appendix A
SMP Development
0.9 MB
Appendix B
Stakeholder Engagement
4.8 MB
Appendix C
Baseline Process Understanding, including
Coastal Process Report (10mb) and
Flood and Erosion Mapping accessible from a separate page including No Active Intervention (NAI) and With Present Management (WPM) assessments, and summaries of the data used in assessments
Appendix D
Natural and Built Environment Baseline (Thematic Review)
Appendix E
Issues and Objective Evaluation
2.2 MB
Appendix F
Strategic Environmental Assessment (links to separate page)
n/a
Appendix G
Scenario Testing
10 MB
Appendix H
Economic Appraisal
1.8 MB
Appendix I
Estuary Assessment
6.8 MB
Appendix J
Habitat Regulation Assessment - Appropriate Assessment
20 MB
Appendix K
The Metadatabase, GIS and Bibliographic Database is provided to the operating authorities on CD. It will be included in the final SMP
Appendix L
Water Framework Directive (WFD)
Appendix M
Review of Coastal Processes and Associated Risks at Hengistbury Head
12.2 MB
The correct policy is Managed Realignment during the third epoch to allow management and transition between main Bournemouth Frontage and Solent Beach. This has been corrected on the amended Policy Summary map (click right). We apologise for the error.
Please report any linking errors to Sarah Austin
The final SMP2 is due to be published in September 2010.
The SMP is a 'living' document that will be reviewed and formally updated at regular intervals.
home • about the smp • the project team • the review • draft smp2 • have your say • faqs
smp1 • other documents • useful links • contacts
© 2007 Poole & Christchurch Bays Coastal Group, last updated 05 August 2010